The Effect of Bleed Water in Concrete Products

I just had a conversation with a producer who is experiencing grout leakage, sand streaking, and the appearance of crack like fissures, often called “worm trails” in the finished product.   This producer uses ready-mixed concrete, and they recently reduced the size of their coarse aggregate from 3/4” rock to 3/8” pea gravel.  The problems that this producer is seeing are mostly the result of excessive bleeding in the concrete mix.

What is meant by the term “bleeding” in concrete?  Bleeding is the term used from the result of gravity that occurs when heavier materials in the placed concrete settle causing the lighter materials (mostly water) to rise toward the surface.  Bleed water is often important to finishers when placing floors, driveways, patios, etc., and it allows the concrete to be properly finished.  In precast, the concrete pieces are so large that the bleed water cannot easily escape.  This leaves the “worm trails” that form along the casting walls that nearly always are vertical and they have the appearance of a crack.  Bleeding also causes scalling and crazing at the horizontal surface due to the higher water percentage in the paste as the water migrates to the surface.

There are three things that a producer can do to improve this condition and reduce the amount of “bleeding” that is occurring.  First, the water to cement ratio (w/c) needs to be as low as practical.  Water is used to cause Portland cement to react and become a paste that hardens within a few hours.  Cement requires about one pound of water for every four pounds of cement to completely hydrate.  That is a w/c of 0.25.  Any additional water is called water of convenience.  Also, a w/c of 0.40 is required to even begin to develop a slump for placement.  Most concrete mixes have about one pound of water for every two pounds of cement, which is twice the amount of water that is necessary for cement hydration.  Chemical admixtures called water reducers allow less water to be necessary to provide flowability, and this will also help reduce the amount of bleed water.

The second modification that a producer can do to improve/reduce the bleed water is to increase the amount of fines in the mix.  A volumetric concrete mix design begins with a determination of the coarse aggregate ratio.  For conventional concretes, this is typically 60-65% of the absolute volume of all materials.  If the producer wishes to reduce bleeding in the concrete, and they have reduced the water to cement ratio to a point where further reductions begin to have an adverse effect on economy, then the next step is to lower the coarse aggregate ratio gradually.  A mix design formula following ACI 211 for the volumetric proportioning of concrete is the method used.  If the producer already has a properly proportioned mix, then begin by reducing the coarse aggregate by 25 pounds and increasing the amount of fine aggregate by the same amount.  This is not an exact relationship, but it will help the producer to achieve a mixture with a lower potential for bleeding.

The third component that a producer can do to reduce the effects of excess bleed water is to add an air entraining admixture (AEA).  The AEA does two things: it takes up a small amount of volume formerly occupied by other materials, and it creates some fluidity to the mix that allows for less water needed for the convenience of placement.  In effect, and AEA can be described as tiny ball bearings in the mix allowing it to be more flowable.

Don’t let excessive bleed water continue to affect your concrete’s appearance and quality.  It is possible to take a few simple steps to solve the root cause of the underlying problem.  The result will wow your customers with a better looking precast concrete product that is more durable and higher quality.

Wednesday, January 4, 2012

Why is my concrete tank leaking?

Watertight concrete tanks are important to specifiers and regulators. The customer's level of expectation is that the product will perform as expected. But occasionally, a leak is noticed at the seam or joint of the product. Why is this occurring, and how can it be fixed?

When a water retaining structure is leaking, the first response is to find fault with the sealing material. While this cannot be ruled out, there are several other potential causes that are contributing to the leak rather than a failure of the sealant. Sealants manufactured to recognized standards such as ASTM C990, have been designed and performance tested to withstand hydrostatic forces present in over 99% of precast concrete products.

PLACEMENT

The first issue that should be mentioned is placement. There is not an exact rule of thumb that works for every type of casting. The placement is dependant on the type of joint, the size of the joint, the weight of the casting, and the volume or size of sealant. Based upon testing, I have found that there are two rules of thumb that I follow. The first is to place the most volume of sealant within the annular space of the joint. The annular space is the intentional void between the angled surfaces of the opposing sections of the joint. Filling the annular space provides the best seal and allows the highest amount of compression. The second rule of thumb is to place the sealant in the joint nearest the hydrostatic force. If this is a water containment structure, then sealant should be placed nearest the inside of the joint.

Placing the sealant always means that at least two ends of the preformed sealant must be joined together. This should be done in a manner that best forms a continuous bead. The sealant should never be stretched. It is best to avoid overlapping and side-by-side placement. The ends should be cut at 45 degree angles, and then worked together by hand to form a continuous piece.

In a square or rectangular structure, the sealant should never be started on a corner. Because three point are all that are truely ever in one plane, leaks are often found in corners. It is best to begin and end the sealant a minimum of 12" from a corner.

The final point to consider is that squeeze out is not always good. Squeeze out is where sealant material is extruded out of the joint. Material that squeezes out of the joint is material that is not being used to fill the joint. With squeeze out, the purchaser does not know if there is a 1" band of sealant in the joint, or a 4" band. A wider band of sealant in the joint will always produce the best seal.

VOLUME

Creating a watertight joint is as much about using the correct volume of sealant material as it is putting it in the right place. Volume is defined as the area in the crossection of the sealant material. Volume is determined by multiplying the height by the width. For instance, a sealant with the crossectional sizes of 0.60H x 0.75W has a volume of 0.45 in. sq. To find the area needed, there are two methods. One is to lay several strips of sealing material across the joint surface, using baby powder to prevent adhesion, and then seting the next section onto the first section. by cutting off the ends of the sealant outside of the joint, and then rolling the compressed material into a roll, the required crossectional volume can be calculated. Use the highest volume of the pieces to determine the proper size.

It should be noted that wider is not better. A common misconception held by many is that a wider pice of sealant is better than a narrow piece. This is a false assumption. Actually, it is best to have a taller piece of sealant and allow the sealant to compress as much as possible. Compression of at least 50% is preferred by most sealant manufacturers. As the sealant is compressed, it gets wider and thinner. At some point, the sealant will not compress any further. This is a point where the resistance force is eaqual to the force applied (weight) over the area of sealant. Time and temperature can affect this.

ADHESION

The final point I will touch on in this blog is adhesion. Sealant has to stic to the concrete to be most affective. Most sealant materials will naturally stick to clean, dry concrete. But if the joint contains dirt, rocks, concrete debris, and dust, the sealant will not stick. The joint surface should be clean and dry, and any dust that is present should be revoved. Primers can improve adhesion in one of two ways: either create a good mating surface imbedded into the concrete surface, or by creating a sticky surface for the sealant to be applied to. Also, most concrete has some level of porosity.

Friday, April 1, 2011

Tunnel Tanks

Here is a good article on the installation of tunnel tanks.

http://www.jepcosales.com/Fall2010.pdf

Monday, February 21, 2011

I have created a blog called Concrete Corrosion where I am going to explain the process of Microbial Induced Corrosion. Please follow me at concretecorrosion.blogspot.com